Project Summary

CC Ground Investigations Limited were engaged as part of the team delivering the ground investigation to determine ground conditions at Barnetby Sidings, Lincolnshire.

Project Details

Four exploratory hole boreholes were carried out using a CCGI Fraste multi-purpose rotary drilling rigs, along with a programme of trial pitting, soakaway and DCP testing.

The program of works included:

  • 4 No rotary boreholes using a Fraste multipurpose rig.
  • In-situ SPT testing
  • Installation of gas and groundwater monitoring standpipes.
  • 21 Trial pits
  • 3 Soakaways
  • 35 TRL DCPs
  • Geotechnical and Geo-environmental laboratory testing
  • Gas and Ground water monitoring
Download our Factsheet
Related Case Studies
A ground investigation was required to provide geotechnical and geo-environmental data for the design of a residential development and associated infrastructure.
A ground investigation was required to provide geotechnical and geo-environmental data for the design of road improvements at a busy road intersection in Sheffield City Centre.
CC Ground Investigations Limited were engaged to deliver geotechnical ground investigation data for the design of a new highway overbridge, attenuation ponds, a roundabout, and a noise bund.