Barnetby Sidings

Download our Factsheet

Project Summary

CC Ground Investigations Limited were engaged as part of the team delivering the ground investigation to determine ground conditions at Barnetby Sidings, Lincolnshire.

Project Details

Four exploratory hole boreholes were carried out using a CCGI Fraste multi-purpose rotary drilling rigs, along with a programme of trial pitting, soakaway and DCP testing.

The program of works included:

  • 4 No rotary boreholes using a Fraste multipurpose rig.
  • In-situ SPT testing
  • Installation of gas and groundwater monitoring standpipes.
  • 21 Trial pits
  • 3 Soakaways
  • 35 TRL DCPs
  • Geotechnical and Geo-environmental laboratory testing
  • Gas and Ground water monitoring
Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.