Project Summary

CC Ground Investigations Limited were engaged by the housebuilder to deliver geotechnical ground investigation data for the design of a new highway overbridge, attenuation ponds, a roundabout, and a noise bund.

Project Details

Twenty-three exploratory hole locations were carried out using a CCGI Fraste multi-purpose rotary drilling rigs, windowless sampler rig and mechanical excavator.

The program of works included:

  • CCGI providing Principal Contractor drilling and engineering services
  • 4 No rotary boreholes using Fraste multipurpose rigs.
  • 8 No Windowless Sampler boreholes.
  • In-situ testing including SPTs
  • 11 Trial Pits
  • 4 No Groundwater monitoring standpipes installed.
  • Geotechnical laboratory testing
  • Groundwater monitoring and sampling
Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.