Shalesmoor Road, Sheffield

Download our Factsheet

Project Summary

A ground investigation was required to provide geotechnical and geo-environmental data for the design of road improvements at a busy road intersection in Sheffield City Centre.

Project Details

Thirty-three exploratory hole locations were carried out using a CCGI Cable Percussion rig, a windowless sampler rig and hand excavation tools.

The program of works included:

  • CCGI providing Principal Contractor drilling and engineering services.
  • 1 No CP boreholes.
  • 22 No Windowless Sampler boreholes.
  • In-situ testing including SPTs
  • 13 hand Dug Trial Pits
  • 2 soakaways.
  • 6 Dynamic Cone penetration Tests (DCPs).
  • Geotechnical laboratory testing.
  • Geoenvironmental laboratory testing.
Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.