Islington

Download our Factsheet

Project Summary

A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.

Project Details

CCGI were commissioned to conduct a site investigation consisting of two 15m rotary boreholes, with dual installations and two subsequent monitoring visits, six foundation pits and environmental sampling within an area of limited workspace.

 

Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.