Eastern Green Link

Download our Factsheet

Project Summary

A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation new high voltage cables.

Project Details

CCGI were engaged to carry out four continuous site investigations comprising 72 rotary boreholes and 15 trial pits, with subsequent monitoring visits, in North Yorkshire for a linear infrastructure project delivering power from areas of energy generation to areas of energy deficiency.

Download our Factsheet
Related Case Studies
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.