Project Summary:

A ground investigation was required to provide geotechnical and geo-environmental data for the design of improvements to the rail network.

Project Details:

Seventeen exploratory locations were carried out using CCGI Fraste rotary rigs and a CCGI windowless sampler rig.

The program of works included:

  • CCGI providing engineering services
  • 8 No rotary boreholes.
  • 8 No Windowless Sampler boreholes.
  • In-situ testing including SPTs
  • 6 No Dynamic probes
  • Geotechnical laboratory testing.
  • Geoenvironmental laboratory testing
  • Gas and groundwater monitoring
  • Inclinometer installation and monitoring
  • Vibrating Wire Piezometer installation and monitoring
  • Factual Reporting

Project Details

Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.