A ground investigation was required to provide geotechnical data for the design of remedial works on a rail cutting.

Project Details:

Twenty-seven exploratory locations were carried out using CCGI Fraste rotary rigs, a CCGI windowless sampler rig and hand pitting.

The program of works included:

  • CCGI providing engineering services
  • 5 No rotary boreholes.
  • In-situ testing including SPTs
  • Rope access to locations on the slope.
  • 3 No Windowless Sampler boreholes.
  • 19 No Test pits
  • 19 No Dynamic probes
  • Geotechnical laboratory testing.
  • Factual Reporting

Project Details

Download our Factsheet
Related Case Studies
Eastern Green Link is one of several developments required to increase the capability of the transmission network from the North-East of Scotland to the North of England. The increase is required to facilitate the growth in flows of renewable energy generation in the North to centres of demand in the South; helping to ensure the UK can meet its target of enabling 40GW of renewable energy by 2030 and achieving a ‘Net Zero economy’ by 2050.
A ground investigation was required to provide geotechnical and geo-environmental data for the design and installation of a new canopy outside of a high rise building in central London.
Ground investigation to provide geotechnical and geo-environmental data for the upgrade of an existing water treatment works.